The bike is as it came from the Dealer (Dealer Installed Package), minus age and condition. It had Ignition, Add-ons, Jets, Air Cleaner, Pipes, etc on the showroom.
It is sold, BTW.
Item Name: FS/FT Chopper Frame Jig
Location: Rocky Face, GA
Zip Code: 30740
Item is for: Sale or Trade
Sale Price: 100
Trade Value or Items Looking For: 100
Caliber: Awesome...
Willing to Ship: No
Bill of Sale Required?: No
Item Description: I have a hardtail chopper frame jig for sale. I...
Item Name: FS/FT 2004 Harley Davidson XL 883 Screaming Eagle
Location: Rocky Face
Zip Code: 30740
Item is for: Sale or Trade
Sale Price: $2900 (Taking Offers)
Trade Value or Items Looking For: Guns or Large Travel Trailer
Willing to Ship: No
Bill of Sale Required?: Yes
Billing Information...
Item Name: FS/FT RENKEN 21' boat and trailer
Location: Rocky Face
Zip Code: 30740
Item is for: Sale or Trade
Sale Price: $300 OBO
Trade Value or Items Looking For: $300
Willing to Ship: No
Bill of Sale Required?: No
Item Description: I have a 21' RENKEN Classic 2000 inboard cabin cruiser...
And Zimmerman walks free... Honorable serviceman is in jail for 25 years and that scumbag (regardless of guilt or innocence, he is a scumbag) walks free.
http://famm.org/michael-giles/
This gentleman defended himself with a pistol and is sentenced to 25 years. The facts are not in dispute but Florida law mandates it.
Apparently, I'm wrong... TECHNICALLY...
https://www.atf.gov/files/regulations-rulings/rulings/atf-rulings/atf-ruling-2011-4.pdf
The ATF says that you CAN convert a pistol into a rifle and then back again... as long as you do things in a certain order and have certain parts nearby, apparently...